1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

Zero-person contractor

A civil contractor that runs itself.

Scroll down to discover
SIC, Super Intelligence Civil

SIC prices the tender, writes the job's documents and runs the project. People sign at the gates.

1

The company

Deal with it like any contractor.

01

Email the team

Write to the project manager, site engineer or estimator. The agent in that role replies.

02

It writes to you

Notices, ITPs, quote requests and work packs, each from the role that owns it.

03

Agents do the work

Contract, method, quality, safety, price and programme. Every line is traced to a clause.

04

People sign

The owner signs the bid, the contract and the claims. Everything else runs on its own.

Run end to end on a real tender. The first live job is next.

2

ChatGPT

Ask about the job in ChatGPT.

Add SIC Civil, sign in, ask. Answers come from the project's own records, filtered to your role.

SIC CivilChatGPT

What hold points apply to the raised platform ramps?

SIC Civil

ITP K08, raised platform ramps. Hold points:

  • K08-01ITP submission10 business days
  • K08-03Half-width joint proposal5 business days
  • K08-08Reinforcement placement5 business days
  • K08-20Non-conformance10 days

Show me the ITP.

Answers quoted from the live SIC Civil server, 2 October 2026.

3

Portal

Every step, with its paperwork.

Pick a day on the programme. The 3D model moves there, with the method, ITP and SWMS beside it.

SIC portal at step 22: the 3D model of the central island on the left, the method tab open on the right listing each action with its source.
Step 22

Step 22, central island. The method, with each action's source.

SIC portal at step 6: the 3D model of the ramp pour on the left, the method tab open on the right with six steps and the hold points marked.
Step 6

Step 6, ramp pour. Six steps, with the hold points marked.

SIC portal at step 6: the 3D model of the ramp on the left, the quality tab open on the right showing the reinforcement hold point with the clause quoted as the test.
Step 6

Step 6, reinforcement hold point. The clause quoted as the test.

4

What it handles

The whole project team.

01

Tender

Pack read, priced, bid.

02

Cost control

Budget, forecast, claims.

03

Procurement

Quotes asked for, compared, ordered.

04

Communications

Emails, letters, calls, the diary.

05

Quality

Lots, ITPs, tests, hold points.

06

Safety

SWMS, permits, inductions.

07

Accounts

Invoices, payments, Xero.

08

Portal

Every step, every day, in 3D.

5

Gates

SIC writes. People sign.

Gate 01

Owner

The bid, the contract and the claims.

Gate 02

Superintendent

Hold points, ITPs and certified claims.

Gate 03

Workers

Their SWMS, signed on their phone.

Gate 04

Suppliers and labs

Quotes, dockets and results, by email.

6

Film

Tender pack to bid, in two and a half minutes.

Tender pack to bid. The film is silent.

Built by Applied Ontologies. Led from Queensland by Tom Lynch, civil engineer.

Working with a few civil contractors as design partners.